Extracted text: Procedures for sharing VA compensation records with Army at Pinellas Park `

Extracted text: Procedures for sharing VA compensation records with Army at Pinellas Park ` results

admin
Edited Text
18-11

November 8, 2011

Procedures for Sharing VA Compensation Records with Army at Pinellas Park
Introduction
The Army Reserve Component (RC) Soldier Medical Support Center (SMSC) is currently
conducting a review of all RC soldiers with Permanent 3 or Permanent 4 (P3/P4) level profiles to
determine which soldiers will require a medical evaluation board (MEB). To support the
Department of the Army in this review, and to mitigate the potential impact to the Integrated
Disability Evaluation System (IDES), VA will provide the SMSC with specific compensation
records (e.g., Compensation and Pension (C&P) exams and rating decisions) within two business
days from receipt of a written request from the SMSC.
This fast letter provides guidance for the Pinellas Park project only. All other programs and
information-sharing agreements beyond the scope of Pinellas Park are unaffected.
VA Resources Required to Support Pinellas Park Project
VBA will provide sufficient personnel to support the Pinellas Park project. At this time, this will
require that the Atlanta VA Regional Office (RO) appoint one individual to serve as the
VA/Pinellas Park Liaison and at least one individual to serve as back up when the primary
liaison is unavailable. The responsibilities of the liaison are outlined below, under VA/Pinellas
Park Liaison Actions.
The liaison (and back up(s)) must have access to the following applications:
COVERS
Share
Map-D
RBA2000
VACOLS
Virtual VA
CAPRI

Atlanta RO must establish a Pinellas Park corporate mailbox to send and receive e-mail
correspondence related to this project. The liaison (and back up(s)) must have access to this
mailbox.
At this time, the current workload at Pinellas Park is not sufficient to require a full-time VA
employee; therefore, at least initially, the liaison can maintain some of his or her regular
responsibilities. However, it is anticipated that the Pinellas Park workload will steadily increase
over time. Once necessitated by workload, the Atlanta RO must provide sufficient coverage to
process the workload in an expedited manner. To facilitate information transfer and expedite
processing, it is recommended that, if possible, the liaison is temporarily out-based to the
Pinellas Park facility.
All other VBA Offices and Centers may also be required to take action to support the Pinellas
Park project. See Responsibilities of VBA Offices and Centers, below.
VA/Pinellas Park Liaison Actions
Upon receipt of a request for compensation records from the Physical Evaluation Board Liaison
Officer (PEBLO) or other designated Army personnel, the VA/Pinellas Park Liaison will review
the request/package to ensure the following information is provided:
a memorandum requesting VA compensation records
the Veteran’s name and Social Security number, and
the MEB summary or other supporting documentation that clearly outlines the specific
conditions the Army has identified that potentially make the Veteran/RC Member unfit
for continued service (referred conditions)
If the package is missing any of the required information noted above create a formal
memorandum for the PEBLO within 24 hours:
note the Veteran’s name and Social Security number,
the date the package was received from the PEBLO,
what information is missing from the package, and
the secure fax number to provide the missing records to the VA Pinellas Park Liaison
within 24 hours
File the request for VA compensation records in the claims folder along with a copy of the
memorandum request for the missing records and the (incomplete) records that were provided.
Request the missing information via secure fax at the phone number provided on the missing
information memorandum.
When the information noted above is provided, the liaison will review all systems to determine if
the Veteran is currently rated as service connected for the referred/potentially unfitting

condition(s). The liaison must also make note of any pending claim(s) or appeal(s) relating to
the referred condition(s).
If the Veteran is not service connected for any of the referred/potentially unfitting conditions,
notify the PEBLO (within two business days of the PEBLO’s request) that no relevant record
exists and send no VA records.
If there is a pending claim (for service connection or increased evaluation) for any of the
referred/potentially unfitting conditions, notify the PEBLO or other designated Army personnel
via e-mail or through the corporate mailbox (within two business days of the PEBLO’s request)
of the pending claim and send no VA records relating to the currently pending claim. Note: If
there is a pending claim for increase, follow the instruction below.
If the Veteran is service connected for any of the referred/potentially unfitting conditions,
provide the PEBLO with copies of the following information:
the original rating decision(s) establishing service connection for the referred/potentially
unfitting condition(s),
any subsequent rating decisions in which the evaluation of the referred/potentially
unfitting conditions were at issue, and
results of the most recent C&P examinations(s), in which the referred/potentially
unfitting conditions were evaluated.
If the Veteran is service connected for a referred/potentially unfitting condition, but has an
appeal pending regarding the evaluation assigned to that condition, it is also necessary to provide
the appeal decision document(s) to include the Statement of the Case (SOC) or Supplemental
Statements of the Case (SSOC), if applicable.
Generally, the following records will be available electronically:
all rating decisions promulgated after February 2007 are available in Virtual VA
the most recent rating decision is available in RBA2000
reports of C&P examinations conducted by VHA are available in CAPRI
reports of C&P examinations conducted by VBA contract providers are available in
Virtual VA
When all required records are available electronically, the VA/Pinellas Park Liaison will:
print all applicable records,
provide the records to the PEBLO or other designated Army personnel (within two
business days of the PEBLO’s request),
complete a one-time Pending Issue Clear (PCLR) of EP 510 in Share.
annotate the memorandum requesting VA compensation records to show that the release
of information request was processed and include the date the records were provided to
the PEBLO, and
upload the memorandum into Virtual VA.

To upload documents into Virtual VA, use “Insert Doc” function (see Virtual VA Users Guide,
Page 52, for more information).
If all required records are not available electronically, the VA/Pinellas Park Liaison will:
e-mail and request same-day service to the RO/RMC that currently maintains the claims
folder via the appropriate Director’s mailbox,
indicate that the case is part of Pinellas Park project and identify the specific documents
that are not available electronically and must be obtained from the claims folder,
request that the RO/RMC scan the documents, upload the files into Virtual VA, and
notify the VA/Pinellas Park Liaison of completion via e-mail within two business days,
establish an EP 510 in Share, with a date of claim to reflect of the date of the e-mail
request,
upon notification from the RO/RMC that the documents have been scanned into Virtual
VA, print and provide the records to the PEBLO,
PCLR the pending EP 510 in Share,
annotate the memorandum requesting VA compensation records to show that the release
of information request was processed and include the date the records were provided to
the PEBLO, and
upload the memorandum into Virtual VA.
Note: Do not send any e-mail that contains personally identifiable information (PII) or protected
health information (PHI) to the PEBLO unless a means to send encrypted
e-mail has been established. Otherwise, document transfer should be accomplished via secure
fax.
Responsibilities of VBA Office and Centers
Upon receipt of a request for records pertaining to a Pinellas Park project case, the RO/RMC
will:
locate the claims folder
ensure all available requested documents are scanned on the same day the request is
received,
upload the files into Virtual VA,
notify the VA/Pinellas Park Liaison of completion via e-mail within two business days,
and
Pending Issue Clear (PCLR) EP 510 in Share.
Note: If the capability to scan documents does not exist at the RO/RMC, the requested
documents should be provided to the VA/Pinellas Park Liaison via secure fax.

Status Updates
Compensation Service will provide notification to all field offices of any pertinent information or
changes regarding the Pinellas Park project.
Questions
Direct all questions concerning this letter to VAVBAWAS/CO/DES.
*****************************************************************************
_________________________
VERNA L. JONES, Director
National Veterans Affairs and